1) Ops Center:
cost: $10000, production time: 20% (5x faster)
Battle Lab:
cost: $15000, production time: 25% (4x faster)
2) Ops Center:
cost: $3000, production time: 400% (4x slower)
Battle Lab:
cost: $5000, production time: 500% (5x slower)
3) Ops Center:
cost: $10000, production time: 150% (1.5x slower)
Battle Lab:
cost: $15000, production time: 200% (2x slower)
4) Ops Center:
cost: $2000, production time: 20% (5x faster)
Battle Lab:
cost: $3500, production time: 25% (4x faster)
Other buildings would be more expensive then, i.e. War Factory, Barracks, Power Plants and so on, e.g.:
Tesla Reactor: $700, Mini Nuclear Reactor: $2500, Nuclear Reactor: $4000
Poll results will be meaningful.
Edited by feillyne, 21 November 2009 - 06:52 AM.